| |||||||
Concept subdivision and concept site plan requirements shall be as follows: | |||||||
A. Tract boundary data based upon tax maps or deed information.
| |||||||
B. Existing topography on and within 200 feet of the tract, including roads, parking areas, streams, public areas, drainage facilities and utilities.
| |||||||
C. Existing contours at a sufficient interval to show general landform on and within 200 feet of the tract based upon U.S.G.S. datum.
| |||||||
D. Existing or proposed easements or covenants affecting the property.
| |||||||
E. Existing roads with names and right-of-way width.
| |||||||
F. Proposed site layout.
| |||||||
G. Names of adjoining property owners.
| |||||||
H. The location of that portion of the tract which is to be subdivided in relation to the entire tract.
| |||||||
I. Area of tract and approximate area of any proposed lots.
| |||||||
J. Proposed method of sewage disposal.
| |||||||
K. Proposed method of water supply.
| |||||||
L. Proposed method of stormwater management.
| |||||||
M. Location of one-hundred-year floodplains with source of information.
| |||||||
N. Location of wetlands with source of information.
| |||||||