| |||||||
[Added 5-19-2004 by L.L. No. 16-2004] | |||||||
| |||||||
A. Radius search:
| |||||||
| |||||||
Names and Addresses $25 residential | |||||||
| |||||||
Names and Addresses $50 commercial/industrial | |||||||
| |||||||
Tax Map Numbers Only $20 | |||||||
| |||||||
Mailing Labels $25 | |||||||
| |||||||
Radius Map $10 | |||||||
| |||||||
Custom Search/Report Fee as determined by the Director of Planning | |||||||
| |||||||
B. Miscellaneous services:
| |||||||
| |||||||
Zoning Maps $35/set or $5/page | |||||||
Zoning Verification Letter $250 | |||||||
| |||||||
Paper Map (photocopy) $2/square foot | |||||||
| |||||||
Aperture Card Map (copy) $10 | |||||||
| |||||||
Arcview GIS Map print | |||||||
| |||||||
$20 "letter size" | |||||||
| |||||||
$30 "A" | |||||||
| |||||||
$40 "B" | |||||||
| |||||||
$50 "C" | |||||||
| |||||||
$100 "D" | |||||||
| |||||||
$130 "F" | |||||||
| |||||||
$175 "E" | |||||||
| |||||||
Aerial Maps per 4 aerial | |||||||
| |||||||
$40 "A" units | |||||||
| |||||||
$50 "B" | |||||||
| |||||||
$70 "C" | |||||||
| |||||||
$100 "D" | |||||||
| |||||||
$130 "E" | |||||||
| |||||||
C. Signs: $15 (per sign).
| |||||||
| |||||||
D. SEQRA (EAF review): $250.
| |||||||
| |||||||
E. Lot line change (adjustment): $250.
| |||||||
| |||||||
F. Certificate of correction: $250.
| |||||||
| |||||||
G. Bond renewal fee: $100.
| |||||||
| |||||||
H. Inspection fee. [Amended 10-13-2004 by L.L. No. 33-2004]
| |||||||
(1)The applicant shall be charged an inspection fee to cover the cost of such inspections as may be reasonably necessary to insure that required on-site and off-site improvements are completed to the satisfaction of the Town, the work is properly performed and the improvements meet state and local specifications. The inspection fee shall be nine percent (9%) of the total construction cost of on-site and off-site improvements, whether or not the improvements are to be publicly owned. The cost of construction shall be established by the most recent Town of Huntington "Requirements Contract." Inspection fees shall be paid in full before the Director of Planning and Environment will stamp the approved site plan or sign the final subdivision map.
| |||||||
| |||||||
(2)At the time of renewal, the amount of the bond shall be recalculated in accordance with the most recent Town of Huntington "Requirements Contact" for all outstanding on-site and off-site improvements. In addition to the renewal fee, an inspection fee calculated at nine percent (9%) of the increase in the bond amount shall be due and payable to the Town.
| |||||||
| |||||||