a. Design and Performance Standards for Stormwater Management Measures.
| |||||||
1. Stormwater management measures for major development shall be developed to meet the erosion control, groundwater recharge, stormwater runoff quantity, and stormwater runoff quality standards in subsection 30-157.4. To the maximum extent practicable, these standards shall be met by incorporating nonstructural stormwater management strategies into the design. If these strategies alone are not sufficient to meet these standards, structural stormwater management measures necessary to meet these standards shall be incorporated into the design.
| |||||||
2. The standards in this section apply only to development exceeding the Stormwater Management Threshold outlined in subsection 30-157.2c. and are intended to minimize the impact of stormwater runoff on water quality and water quantity in receiving water bodies and maintain groundwater recharge. The standards do not apply to new development to the extent that alternative design and performance standards are applicable under a regional stormwater management plan or Water Quality Management Plan adopted in accordance with Department rules. (Ord. No. 2006-06 § 3)
| |||||||
| |||||||
a. The development shall incorporate a maintenance plan for the stormwater management measures incorporated into the design of a major development in accordance with subsection 30-157.10.
| |||||||
b. Stormwater management measures shall avoid adverse impacts of concentrated flow on habitat for threatened and endangered species as documented in the Department's Landscape Project or Natural Heritage Database established under N.J.S.A. 13:1B-15.147 through 15.150, particularly Helonias bullata (swamp pink) and/or Clemmys muhlnebergi (bog turtle).
| |||||||
c. The following linear development projects are exempt from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements of subsections 30-157.4f. and 30-157.4g:
| |||||||
1. The construction of an underground utility line provided that the disturbed areas are revegetated upon completion;
| |||||||
2. The construction of an above-ground utility line provided that the existing conditions are maintained to the maximum extent practicable; and
| |||||||
3. The construction of a public pedestrian access, such as a sidewalk, walkways or trail with a maximum width of fourteen (14) feet, provided that the access is made of permeable material.
| |||||||
d. A waiver from strict compliance from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements of subsections 30-157.4f. and 30-157.4g. may be obtained for the enlargement of an existing public roadway or railroad; or the construction or enlargement of a public pedestrian access, provided that the following conditions are met:
| |||||||
1. The applicant demonstrates that there is a public need for the project that cannot be accomplished by any other means;
| |||||||
2. The applicant demonstrates through an alternatives analysis, that through the use of nonstructural and structural stormwater management strategies and measures, the option selected complies with the requirements of subsections 30-157.4f. and 30-157.4g. to the maximum extent practicable;
| |||||||
3. The applicant demonstrates that, in order to meet the requirements of subsections 30-157.4f. and 30-157.4g., existing structures currently in use, such as homes and buildings, would need to be condemned; and
| |||||||
4. The applicant demonstrates that it does not own or have other rights to areas, including the potential to obtain through condemnation lands not falling under subsection 30-157.4d,3. above within the upstream drainage area of the receiving stream, that would provide additional opportunities to mitigate the requirements of subsections 30-157.4f. and 30-157.4g. that were not achievable on-site.
| |||||||
e Nonstructural Stormwater Management Strategies. | |||||||
1. To the maximum extent practicable, the standards in subsections 30-157.4f. and 30-157.4g. shall be met by incorporating nonstructural stormwater management strategies set forth at subsection 30-157.4e. into the design. The applicant shall identify the nonstructural measures incorporated into the design of the project. If the applicant contends that it is not feasible for engineering, environmental, or safety reasons to incorporate any nonstructural stormwater management measures identified in paragraph 2 below into the design of a particular project, the applicant shall identify the strategy considered and provide a basis for the contention.
| |||||||
2. Nonstructural stormwater management strategies incorporated into site design shall:
| |||||||
(a) Protect areas that provide water quality benefits or areas particularly susceptible to erosion and sediment loss;
| |||||||
(b) Minimize impervious surfaces and break up or disconnect the flow of runoff over impervious surfaces;
| |||||||
(c) Maximize the protection of natural drainage features and vegetation;
| |||||||
(d) Minimize the decrease in the "time of concentration" from pre-construction to post construction. "Time of concentration" is defined as the time it takes for runoff to travel from the hydraulically most distant point of the watershed to the point of interest within a watershed;
| |||||||
(e) Minimize land disturbance including clearing and grading;
| |||||||
(f) Minimize soil compaction;
| |||||||
(g) Provide low-maintenance landscaping that encourages retention and planting of native vegetation and minimizes the use of lawns, fertilizers and pesticides;
| |||||||
(h) Provide vegetated open-channel conveyance systems discharging into and through stable vegetated areas;
| |||||||
(i) Provide other source controls to prevent or minimize the use or exposure of pollutants at the site, in order to prevent or minimize the release of those pollutants into stormwater runoff. Such source controls include, but are not limited to:
| |||||||
(1) Site design features that help to prevent accumulation of trash and debris in drainage systems, including features that satisfy subsection 30-157.4e,3. below; | |||||||
(2) Site design features that help to prevent discharge of trash and debris from drainage systems; | |||||||
(3) Site design features that help to prevent and/or contain spills or other harmful accumulations of pollutants at industrial or commercial developments; and | |||||||
(4) When establishing vegetation after land disturbance, applying fertilizer in accordance with the requirements established under the Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39 et seq., and implementing rules. | |||||||
3. Site design features identified under subsection 30-157.4e,2(i)(2) above shall comply with the following standard to control passage of solid and floatable materials through storm drain inlets. For purposes of this paragraph, "solid and floatable materials" means sediment, debris, trash, and other floating, suspended, or settleable solids. For exemptions to this standard see subsection 30-157.4e,3(c) below.
| |||||||
(a) Design engineers shall use either of the following grates whenever they use a grate in pavement or another ground surface to collect stormwater from that surface into a storm drain or surface water body under that grate:
| |||||||
(1) The New Jersey Department of Transportation (NJDOT) bicycle safe grate, which is described in Chapter 2.4 of the NJDOT Bicycle Compatible Roadways and Bikeways Planning and Design Guidelines (April 1996); or | |||||||
(2) A different grate, if each individual clear space in that grate has an area of no more than seven (7.0) square inches, or is no greater than 0.5 inches across the smallest dimension. | |||||||
Examples of grates subject to this standard include grates in grate inlets, the grate portion (non-curb opening portion) of combination inlets, grates on storm sewer manholes, ditch grates, trench grates, and grates of spacer bars in slotted drains. Examples of ground surfaces include surfaces of roads (including bridges), driveways, parking areas, bikeways, plazas, sidewalks, lawns, fields, open channels, and stormwater basin floors. | |||||||
(b) Whenever design engineers use a curb-opening inlet, the clear space in that curb opening (or each individual clear space, if the curb opening has two (2) or more clear spaces) shall have an area of no more than seven (7.0) square inches, or be no greater than two (2.0) inches across the smallest dimension.
| |||||||
(c) This standard does not apply:
| |||||||
(1) Where the review agency determines that this standard would cause inadequate hydraulic performance that could not practicably be overcome by using additional or larger storm drain inlets that meet these standards; | |||||||
(2) Where flows from the water quality design storm as specified in subsection 30-157.4g,l. are conveyed through any device (e.g., end of pipe netting facility, manufactured treatment device, or a catch basin hood) that is designed, at a minimum, to prevent delivery of all solid and floatable materials that could not pass through one (1) of the following: | |||||||
[a] A rectangular space four and five-eighths (4 5/8) inches long and one and one-half (1 1/2) inches wide (this option does not apply for outfall netting facilities); or | |||||||
[b] A bar screen having a bar spacing of 0.5 inches. | |||||||
(3) Where flows are conveyed through a trash rack that has parallel bars with one (1) inch spacing between the bars, to the elevation of the water quality design storm as specified in subsection 30-157.4g,1; or | |||||||
(4) Where the New Jersey Department of Environmental Protection determines, pursuant to the New Jersey Register of Historic Places Rules at N.J.A.C. 7:4-7.2(c), that action to meet this standard is an undertaking that constitutes an encroachment or will damage or destroy the New Jersey Register listed historic property. | |||||||
4. Any land area used as a nonstructural stormwater management measure to meet the performance standards in subsections 30-157.4f. and 30-157.4g. shall be dedicated to a government agency, subjected to a conservation restriction filed with the appropriate County Clerk's office, or subject to an approved equivalent restriction that ensures that measure or an equivalent stormwater management measure approved by the reviewing agency is maintained in perpetuity.
| |||||||
5. Guidance for nonstructural stormwater management strategies is available in the New Jersey Stormwater Best Management Practices (BMP) Manual. The BMP Manual may be obtained from the address identified in subsection 30-157.7, or found on the Department's website at www.njstormwater.org.
| |||||||
f. Erosion Control, Groundwater Recharge and Runoff Quantity Standards.
| |||||||
1. This subsection contains minimum design and performance standards to control erosion, encourage and control infiltration and groundwater recharge, and control stormwater runoff quantity impacts of major development.
| |||||||
(a) The minimum design and performance standards for erosion control are those established under the Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39 et seq. and implementing rules.
| |||||||
(b) The minimum design and performance standards for groundwater recharge are as follows:
| |||||||
(1) The design engineer shall, using the assumptions and factors for stormwater runoff and groundwater recharge calculations at subsection 30-157.5, either: | |||||||
[a] Demonstrate through hydrologic and hydraulic analysis that the site and its stormwater management measures maintain one hundred (100%) percent of the average annual preconstruction groundwater recharge volume for the site; or | |||||||
[b] Demonstrate through hydrologic and hydraulic analysis that the increase of stormwater runoff volume from preconstruction to post-construction for the 2-year storm is infiltrated. | |||||||
(2) This groundwater recharge requirement does not apply to projects within the "urban redevelopment area," or to projects subject to subsection 30-157.4f,1(b)(3) below. | |||||||
(3) The following types of stormwater shall not be recharged: | |||||||
[a] Stormwater from areas of high pollutant loading. High pollutant loading areas are areas in industrial and commercial developments where solvents and/or petroleum products are loaded/unloaded, stored, or applied, areas where pesticides are loaded/unloaded or stored; areas where hazardous materials are expected to be present in greater than "reportable quantities" as defined by the United States Environmental Protection Agency (EPA) at 40 CFR 302.4; areas where recharge would be inconsistent with Department approved remedial action work plan or landfill closure plan and areas with high risks for spills of toxic materials, such as gas stations and vehicle maintenance facilities; and | |||||||
[b] Industrial stormwater exposed to "source material." "Source material" means any material(s) or machinery, located at an industrial facility that is directly or indirectly related to process, manufacturing or other industrial activities, which could be a source of pollutants in any industrial stormwater discharge to groundwater. Source materials include, but are not limited to, raw materials; intermediate products; final products; waste materials; by-products; industrial machinery and fuels, and lubricants, solvents, and detergents that are related to process, manufacturing, or other industrial activities that are exposed to stormwater. | |||||||
(4) The design engineer shall assess the hydraulic impact on the groundwater table and design the site so as to avoid adverse hydraulic impacts. Potential adverse hydraulic impacts include, but are not limited to, exacerbating a naturally or seasonally high water table so as to cause surficial ponding, flooding of basements, or interference with the proper operation of subsurface sewage disposal systems and other subsurface structures in the vicinity or down gradient of the groundwater recharge area. | |||||||
(c) In order to control stormwater runoff quantity impacts, the design engineer shall, using the assumptions and factors for stormwater runoff calculations at subsection 30-157.5, complete one (1) of the following:
| |||||||
(1) Demonstrate through hydrologic and hydraulic analysis that for stormwater leaving the site, post-construction runoff hydrographs for the 2-, 10-, and 100-year storm events do not exceed, at any point in time, the preconstruction runoff hydrographs for the same storm events; | |||||||
(2) Demonstrate through hydrologic and hydraulic analysis that there is no increase, as compared to the preconstruction condition, in the peak runoff rates of stormwater leaving the site for the 2-, 10-, and 100-year storm events and that the increased volume or change in timing of stormwater runoff will not increase flood damage at or downstream of the site. This analysis shall include the analysis of impacts of existing land uses and projected land uses assuming full development under existing zoning and land use ordinances in the drainage area; | |||||||
(3) Design stormwater management measures so that the post-construction peak runoff rates for the 2-, 10- and 100-year storm events are 50, 75 and 80 percent, respectively, of the preconstruction peak runoff rates. The percentages apply only to the post-construction stormwater runoff that is attributable to the portion of the site on which the proposed development or project is to be constructed. The percentages shall not be applied to post-construction stormwater runoff into tidal flood hazard areas if the increased volume of stormwater runoff will not increase flood damages below the point of discharge; or | |||||||
(4) In tidal flood hazard areas, stormwater runoff quantity analysis in accordance with paragraphs (1), (2) and (3) above shall only be applied if the increased volume of stormwater runoff could increase flood damages below the point of discharge. | |||||||
2. Any application for a new agricultural development that meets the definition of major development in subsection 30-157.2 shall be submitted to the appropriate Soil Conservation District for review and approval in accordance with the requirements of this subsection and any applicable Soil Conservation District guidelines for stormwater runoff quantity and erosion control. For the purposes of this subsection, "agricultural development" means land uses normally associated with the production of food, fiber and livestock for sale. Such uses do not include the development of land for the processing or sale of food and the manufacturing of agriculturally related products.
| |||||||
g. Stormwater Runoff Quality Standards.
| |||||||
1. Stormwater management measures shall be designed to reduce the post-construction load of total suspended solids (TSS) in stormwater runoff by eighty (80%) percent of the anticipated load from the developed site, expressed as an annual average. Stormwater management measures shall only be required for water quality control if an additional one-quarter (1/4) acre of impervious surface is being proposed on a development site. The requirement to reduce TSS does not apply to any stormwater runoff in a discharge regulated under a numeric effluent limitation for TSS imposed under the New Jersey Pollution Discharge Elimination System (NJPDES) rules, N.J.A.C. 7:14A, or in a discharge specifically exempt under a NJPDES permit from this requirement. The water quality design storm is one and one-quarter (1.25) inches of rainfall in two (2) hours. Water quality calculations shall take into account the distribution of rain from the water quality design storm, as reflected in Table 1. The calculation of the volume of runoff may take into account the implementation of nonstructural and structural stormwater management measures.
| |||||||
| |||||||
|